2382 - 2384 Av. West Hill
Montréal (Côte-des-Neiges/Notre-Dame-de-Grâce), Montréal H4B 2S4
SALE$679,000
2 Bedrooms
1 Bathrooms
6 Rooms
2382 - 2384 Av. West Hill
Montréal (Côte-des-Neiges/Notre-Dame-de-Grâce), Montréal H4B 2S4
Room
Dimensions
Level
Flooring
Description
property photos
property location
property details
Type of property : Multi-family (2 to 5 units) (Duplex)
Type of building : Attached
Floors : 2
Rooms : 6
Bedrooms : 2
Bathrooms : 1
Powder Rooms : 0
Living Area :
Lot Size : 258.7 Square meters
Lot Evaluation : $305,300
Building Evaluation : $388,100
Total Evaluation : $693,400
tax and expenses
Municipal Taxes : $3,867
School taxes : $445
property characteristics
Heating system : Electric baseboard units
Water supply : Municipality
Heating energy : Electricity
Proximity : Other (Grocery stores, pharmacy, restaurants, etc)
Proximity : Highway
Proximity : Golf
Proximity : Hospital
Proximity : Park - green area
Proximity : Elementary school
Proximity : High school
Proximity : Public transport
Proximity : University
Available services : Fire detector
Basement : 6 feet and over
Basement : Finished basement
Sewage system : Municipal sewer
Zoning : Residential
Proximity : Bicycle path
Equipment available : Wall-mounted heat pump
*This sale is made without any legal warranties as to
quality and title; at the Buyer(s) own risk and perils.
*All Promises to Purchase, without exception, must be
written using the mandatary form, Promise to Purchase -
Public Curator.
*As per Bill 96, the party wishes that these documents be
drawn up in English. Effective, September 1, 2022, all
notarial home ownership documents will be drawn up in
French. Should either party want any document(s) translated
into English, they must contact a Notary or a Certified
Translator to do so, and there will be an extra charge
which will be borne by the respective party(ies) who
requested such.
*Ref. 5.1: Date or time frame for the signing of the deed
of sale: All Promises to Purchase shall be conditional to
obtaining a judgement which should take place in
approximately 60 days following the signing of this
contract (guideline). Should such judgement result in
proceeding with the selling of the immovable, the suggested
delay shall be an additional 30 days following such.